Environmental risk assessment: case study of Eburru geothermal wellhead power plant

Philip Juma Barasa, Paul Kipkorir Sang Magut

1 Kenya Electricty Generating Company Limited, KENYA 2 Department of Chemistry, Dedan Kimathi University of Technology, Kenya

IJDS 2018; 7(10): 2570–2584.
Article ID: IJDS18030101

Read full article (PDF)

Abstract

The broad objective of the study was to investigate potential environmental risks of Eburru wellhead geothermal power plant on the local community. Primary data on perception of the local community towards the potential risks was collected through focus group discussions, interviews and structured questionnaires. The questionnaires were administered to ninety five (95) households residing in four villages neighbouring the power plant in Eburru location, Gilgil Sub-county. Historical data on brine chemistry, noise and hydrogen sulphide (H S) gas was also reviewed and 2 analyzed. The study found out that the local community consider Eburru wellhead power plant to impact them negatively. In terms of severity of the impacts, the highest ranked risk was associated with H S gas odour, followed by 2 noise emission, atmospheric venting of geothermal fluids and brine discharge. The chemistry of the brine did not meet the recommended limit for effluent discharge into the environment. The ambient H S gas levels measured outside the 2 boundary of the power plant exceeded the 24 hour average tolerant limit of 0.0355 ppm up to a distance of 100 m in the northern direction. Ambient noise levels exceeded the tolerable limit of 35 dB (A) up to a distance of 1100 m from the boundary of the power plant. The ambient noise level does not warrant hearing impairment. Atmospheric brine spray can cause damage to the surrounding vegetation due to elevated levels of boron. Relocation of the affected persons within a radius of 1.5 km from the boundary of the power plant is recommended. Other measures include use of engineering measures to reduce noise, H S and atmospheric spray of brine, installation of a reinjection system and 2 stepping up education and awareness among the locals. Precautionary principle should be considered in the initial design of future geothermal power plants. Further research should consider studies on diurnal variation of H S gas 2 emission, epidemiological studies to determine real impacts of noise and H S on the health of the locals and an 2 experiment to determine the fall out area of atmospheric brine spray and deposition.

Keywords: Precautionary Principle; Wellhead; Eburru; Community Perception

How to cite

Barasa, P.J. and Magut, P.K.S. (2018), “Environmental risk assessment: case study of Eburru geothermal wellhead power plant”, International Journal of Development and Sustainability, Vol. 7 No. 10, pp. 2570-2584.

Download citation: RIS · BibTeX

Copyright and licence

© 2018 The Author(s). Copyright is retained by the authors.

This article is available under CC BY 4.0. You may share and adapt the work with appropriate attribution, a link to the licence, and an indication of changes. Third-party material is included unless otherwise indicated in its credit line.

Read the journal’s publication policies